The change-control plan section
If your model will be retrained or updated after it reaches the market, a Predetermined Change Control Plan can authorize those changes in advance. We draft it from your answers, beside the plans the FDA has already authorized in your product code.
From $6,000 · the fee for your device is fixed in writing before work starts
What you get
- The three parts the FDA's guidance asks for, drafted from your answers: description of modifications, modification protocol with pre-defined acceptance criteria, impact assessment
- Every sentence citing your own documents or answers, reviewed sentence by sentence; anything unsourced listed, never included
- The plans the FDA has authorized in your product code, as precedent
PDF and Word. Delivered within submission drafting, or on its own.
How it works
1
Send one document, free
A description of your model and how it will change. A one-page reply in two working days, with a fixed quote.
2
Agree the fee and terms
The fee is fixed in writing; your documents come under a signed confidentiality agreement.
3
Receive the section
Drafted from your answers, reviewed sentence by sentence, with a walkthrough call.
What we need from you
- What you expect to change in the model, and how often
- How you would test each change, and your acceptance criteria if you have them
- Your device description and indications for use
Change-control plans are becoming routine
The FDA’s list of authorized devices with a PCCP holds 240 authorizations across 102 product codes: 29 decided in 2024 and 104 in 2025.
FDA, Predetermined Change Control Plans: List of Authorized Devices with PCCPs, list current as of 2026-10-20, captured 2026-10-26. Marketing Submission Recommendations for a Predetermined Change Control Plan for Artificial Intelligence-Enabled Device Software Functions, issued 2025-08-18.
Is it for you?
Right for you if you are asking
“Can our planned model updates be authorized now, instead of filing for each one later?”
Because
- Retraining or updating the model is part of the product plan.
- Without a plan, a change that affects safety or effectiveness can need a new submission.
- A plan covers only the modifications it describes, so it has to be written carefully.
For AI-device teams with a model roadmap, usually alongside a 510(k) or De Novo.
Not the right fit if
- Your model is locked and no changes are planned
- You need to decide on one change you are making now: the model-change assessment
Questions